Direct answer
Evaluate an Asian food supplier against a written product brief and evidence checklist, not a broad company presentation. Confirm the proposed SKU, production facility, specification, ingredients and allergens, storage, pack, sample result, quality controls, change process, logistics responsibilities and the evidence required for the destination market.
Use the procurement workflow Review quality-control questions Send a supplier-matching brief
Separate company screening from product approval
A capable company may still be unsuitable for a particular SKU, pack, claim or destination. First screen the legal entity and proposed production facility. Then approve the exact product through specifications, evidence and samples. Keep both decisions documented.
Supplier comparison scorecard
| Area | Questions | Evidence to record |
|---|---|---|
| Product fit | Can the proposed SKU meet the written format, ingredient, storage and pack brief? | Specification and product sample |
| Production fit | Which facility and line would make it, and what controls apply? | Facility and process information relevant to the SKU |
| Claims and labels | Which statements are requested and who validates them? | Formula, allergen, label and claim evidence |
| Quality | What is checked before, during and after production? | Acceptance limits, records and exception process |
| Commercial fit | Can pack, volume and timing be planned for this production option? | Written quotation assumptions and validity |
Red flags to resolve before approval
- The quotation does not identify the exact SKU, pack or production facility.
- General certificates are presented as proof for every product or market.
- Formula, allergen or packaging changes can occur without written approval.
- Samples are evaluated without a recorded preparation method or scorecard.
- Storage, shelf-life evidence, coding or traceability responsibilities are unclear.
Make the RFQ comparable
Give each candidate the same destination, product, channel, pack, volume range, evidence request and target timing. Record assumptions and gaps instead of treating a missing answer as confirmation. This produces a decision trail that can be reviewed before samples, artwork or an order are approved.
Choose the next step
Continue with the right sourcing request
MOQ, timing, sampling, documents and supply options are confirmed for the selected SKU, producing facility, project and destination market.
